• FM-518-Property-Impact


  • TX DOT RECONSRUCTION AND WIDENING PROJECT
    FM 518 FROM SH 288 TO SH 35

    TxDOT is proposing the reconstruction and widening of FM 518 from SH 288 to SH 35 in Brazoria County, Texas. The project is needed because current and projected growth in the area has caused traffic demand to increase. The existing roadway is designed with two-way left-turn lanes, and lack of consistent raised medians throughout the project limits, which has resulted in high crash numbers at intersections and other conflict points.

    The purpose of the proposed project is to accommodate future anticipated traffic demand and growth in the region, as well as to improve safety and mobility by constructing a divided roadway with raised medians.

    YOU MUST ACT NOW!

    • Design is scheduled to start in 6 months. 
    • As a key participant in the shaping of public policy, you or your representative are invited to attend
    • FM518 Ad Hoc Committee meetings, the third Tuesday of each month, 9 to 10 am, The Commerce Center, 6117 Broadway St 77581
    • Whether you are a Pearland Chamber member or not, this invitation-only meeting is an opportunity to provide you ample time to communicate and consider your options as the reconstruction and widening project develops.  The meetings will help you create a plan for averting a serious disruption to your business. Don’t miss this chance to engage in a discussion of this important issue.  


    Helpful Web Links (some of these links load very slowly, please be patient)

    Project Description
     
    Project Location Map
     
    FM 518 Schematic - from SH 288 to Tranquility Lake Boulevard
     
    FM 518 Schematic - from Oak Road Boulevard to SH 35
  •